The purpose of the meeting is to check the progress made in the last four months of the project and then focus on the steps needed to clarify before the review, and refining the ALIVE architectural components and their connections issues at coordination and organisational level, and stablish a full picture of architecture and methodology. Also check the status of the three use case scenarios, specially in the modelling.